17 Changing ground level
A person must not, without reasonable excuse, change the ground level—
(a)
below an aerial line or any point to which the line may swing; or
(b)
above or adjacent to an electricity network facility;
if that is likely to damage the line or facility, endanger its safe or efficient operation, or impede reasonable access to it for the purposes of its operation.
Maximum penalty: 10 penalty units.