s 6
In forceWastes destined for recovery operations that require control procedures to allow transboundary movement
Part 1Preliminary
6 Wastes destined for recovery operations that require control procedures to allow transboundary movement
(1)
The wastes listed in Appendix 3 to the OECD Decision are subject to the green control procedure.
(2)
The wastes listed in Appendix 4 to the OECD Decision are subject to the amber control procedure.
Note:
The OECD Decision on the control of transboundary movements of wastes destined for recovery operations sets out a two‑tier system to delineate controls to be applied to movements of such wastes. The two procedures are the green control procedure and the amber control procedure.
Research tools for this sectionPro
The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.