Barrister AI
All legislation
QLDRegulation
In force
This is the latest official compilation.Check the official source →
reg 27

Deciding applications to increase maximum rate for water licences

In force
Part 5Strategies for achieving outcomes
Division 1CDealings with water licences

27 Deciding applications to increase maximum rate for water licences

(1)

This section applies to the chief executive in making a decision about an application to increase the maximum rate for a water licence to take surface water.

(2)

The chief executive may grant the application if—

(a)

the existing works for taking surface water under the licence have the capacity to take water at the maximum rate applied for; and

(b)

if the existing works include a pump—the maximum rate applied for does not exceed—

(i)

for a pump of a size mentioned in schedule 8, column 1—the corresponding rate stated in schedule 8, column 2 for the pump size; or

(ii)

for a pump of another size—the rate decided by the chief executive having regard to the corresponding rates stated for similar pump sizes in schedule 8, column 2.

Research tools for this sectionPro

The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.