50
In forceMaximum rate for water allocation based on rate stated on existing authorisation
Part 5Water allocations
Division 1Criteria for establishing elements of particular proposed water allocations
Subdivision 3Establishing volumetric limits
50 Maximum rate for water allocation based on rate stated on existing authorisation
If a water plan states that the maximum rate for a water allocation is to be based on the maximum rate for the existing authorisation, the maximum rate for the allocation is the maximum rate for taking water under the existing authorisation.
Research tools for this sectionSubscription
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.