Barrister AI
All legislation
TASAct
In force
This is the latest official compilation.Check the official source →
s 56ZA

Entry to install and read meters

In force
Part 4Regulation of Water and Sewerage Industry
Division 2APowers and obligations of regulated entities
Subdivision 5Installation, reading and testing of meters

56ZA Entry to install and read meters

A water and sewerage officer or a meter reader may enter on land to – read, or check the accuracy of, a meter; and install, repair, modify or replace a meter or adjoining pipe work; and examine any water system or sewerage system.

A water and sewerage officer, or a meter reader, of a regulated entity may only exercise the power of entry between the hours of 7 a.m. and 7 p.m. on any day, unless the regulated entity determines that an emergency exists.

If entry is refused or obstructed, the regulated entity, by notice in writing to the owner or occupier of the land, may request entry, stating the reason, date and time of proposed entry.

If entry is refused again, the regulated entity may – restrict the supply of water if it is possible to do so without entering on the land; or if it is not possible to restrict the supply of water without entering on the land, obtain a warrant under section 56ZO to enter on land to restrict the water supply.

The regulated entity must remove the restriction to the supply of water if – the owner or occupier consents to the entry and pays an appropriate fee; and it is safe to enter on the land.

The appropriate fee referred to in subsection (5)(a) may include the reasonable costs incurred in the installation or removal of a device used to restrict the supply of water.

Research tools for this sectionPro

The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.