43
CurrentPropagation of vertical datum
43 Propagation of vertical datum
(1)
This section applies to the following—
(a)
a stratum survey,
(b)
an urban land survey carried out to insert a new permanent survey mark if there are 2 permanent survey marks with accurate AHD values within 250m of the land surveyed.
(2)
The surveyor must determine an accurate AHD value for—
(a)
each new permanent survey mark or bench mark, and
(b)
each permanent survey mark or bench mark to which the survey connects.
Research tools for this sectionSubscription
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.