Access to sites of broadcasting transmission towers
46 Access to sites of broadcasting transmission towers
Television broadcasting services in digital mode
The owner or operator of a broadcasting transmission tower must, if requested to do so by the holder of a commercial television broadcasting licence (the access seeker), or a national broadcaster (also the access seeker), give the access seeker access to a site if:
the tower is situated on the site; and
either:
the site is owned, occupied or controlled by the owner or operator of the tower; or
the owner or operator of the tower has a right (either conditional or unconditional) to use the site.
The owner or operator of the broadcasting transmission tower is not required to comply with subclause (1) unless:
the access is provided for the sole purpose of enabling the access seeker to install or maintain a transmitter and/or associated facilities used, or for use, wholly or principally in connection with the transmission of the access seeker’s television broadcasting service or services in digital mode; and
the access seeker gives the owner or operator reasonable notice that the access seeker requires the access.
Compliance not technically feasible
The owner or operator of a broadcasting transmission tower is not required to comply with subclause (1) if there is in force a written certificate issued by the ACMA stating that, in the ACMA’s opinion, compliance with subclause (1) in relation to that tower is not technically feasible.
In determining whether compliance with subclause (1) in relation to a site is technically feasible, the ACMA must have regard to:
whether compliance is likely to result in significant difficulties of a technical or engineering nature; and
whether compliance is likely to result in a significant threat to the health or safety of persons who operate, or work on, a facility situated on the site; and
if compliance is likely to have a result referred to in paragraph (a) or (b)—whether there are practicable means of avoiding such a result, including (but not limited to):
changing the configuration or operating parameters of a facility situated on the site; and
making alterations to a facility situated on the site; and
such other matters (if any) as the ACMA considers relevant.
Issue of certificate
If the ACMA receives a request to make a decision about the issue of a certificate under subclause (5), the ACMA must use its best endeavours to make that decision within 10 business days after the request was made.