Extension of trial Rule
262A Extension of trial Rule
Subject to this section, the AEMC may, on request, extend, by notice, the date on which a trial Rule will expire (the expiry date) to a later date, being a date that falls not more than the period prescribed by the National Regulations after the expiry date.
Before extending the expiry date of a trial Rule, the AEMC—
must have regard to the innovative trial principles; and
must consult with the AER; and
if the AEMC considers that the trial Rule, or the trial project to which the trial Rule relates, may impact on AEMO's operation of national energy systems and national energy markets—must consult with AEMO; and
may consult with any other person.
A request under subsection (1) must—
be made to the AEMC at least 60 days before the expiry date; and
specify the length of the extension required.
A notice under subsection (1) must—
be published; and
specify the later date referred to in subsection (1).
The expiry date of a trial Rule may only be extended once under subsection (1).
Sign in to see bill, explanatory material, and regulations and instruments
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.