Excavation in, above, below or adjacent to future infrastructure corridors
4.9 Excavation in, above, below or adjacent to future infrastructure corridors
This section applies to development that involves the penetration of ground to a depth of at least 2 metres below ground level (existing) on land—
within, below or above a future infrastructure corridor, or
within 25 metres (measured horizontally) of a future infrastructure corridor, or
within 25 metres (measured horizontally) of the ground directly below a future infrastructure corridor, or
within 25 metres (measured horizontally) of the ground directly above an underground future infrastructure corridor.
Development consent must not be granted to development to which this section applies unless the consent authority has considered the Development Near Rail Corridors and Busy Roads – Interim Guideline published in December 2008 by the Department.
(Repealed)