Draft variations to remove inconsistency with directions under Act s. 74AL
33 Draft variations to remove inconsistency with directions under Act s. 74AL
This regulation applies if —
the Minister has given a direction under section 74AL of the Act in relation to a GHG injection licence; and
the direction is inconsistent with anything in an approved site plan in relation to an identified GHG storage formation specified in the licence.
The licensee must, within the period mentioned in subregulation (3) —
prepare a draft variation of the site plan for the purpose of removing the inconsistency; and
give the draft variation to the Minister.
For the purposes of subregulation (2), the period is —
60 days beginning on the day on which the direction was given; or
if the Minister agrees in writing to a longer period — that longer period.