Barrister AI
All legislation
WARegulation
In force
This is the latest official compilation.Check the official source →
reg 34

Draft variation following occurrence of certain events

In force

34 Draft variation following occurrence of certain events

(1)

This regulation applies if —

(a)

an approved site plan is in force in relation to an identified GHG storage formation specified in a GHG injection licence; and

(b)

an event mentioned in the Table occurs.

Table

Item

Event

1.

The site plan is no longer accurate and up‑to‑date because there is new information that significantly alters the determination of any of the following —

(a) the fundamental suitability determinants of the formation;

(b) the expected migration pathway or pathways of each greenhouse gas substance stored in, or to be injected into and stored in, the formation;

(c) predictions set out in Part A of the site plan for the behaviour of each greenhouse gas substance stored in, or to be injected into and stored in, the formation;

(d) interactions between the formation and the method by which a greenhouse gas substance is injected into the formation;

(e) any other matter relevant to the safe and secure storage of a greenhouse gas substance in the formation.

2.

The licensee proposes to make a change, or a series of changes, to the way the operations in the approved site plan are carried out that will affect —

(a) predictions set out in Part A of the site plan for the behaviour of each greenhouse gas substance stored in, or to be injected into and stored in, the formation; or

(b) the risks associated with those operations.

3.

The licensee proposes to make a significant change to the way the operations in the approved site plan are managed that will affect the integrated operations management plan.

(2)

The licensee must, within the period mentioned in subregulation (3) —

(a)

prepare a draft variation of the site plan for the purpose of addressing the circumstances of the event; and

(b)

give the draft variation to the Minister.

Penalty for this subregulation: a fine of $10 000.

(3)

For the purposes of subregulation (2), the period is —

(a)

60 days beginning on the day on which the event occurs; or

(b)

if the Minister agrees in writing to a longer period — that longer period.

Research tools for this sectionPro

The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.