Barrister AI
All legislation
NTRegulation
In force
This is the latest official compilation.Check the official source →
reg 42

Plan of survey and other information

In force

42 Plan of survey and other information

(1) The plan of survey mentioned in section 76(2) of the Act or regulation 36(b) must clearly depict the survey area in a way that enables it to be accurately located (for example, by showing significant topographical features and boundaries of land held under the Land Title Act 2000).

(2)

The plan of survey must include:

(a) the latitude and longitude in the relevant national datum of each boundary marker and the dimensions of the boundary lines; and

(b) a photograph of the datum post, the datum plate and each corner boundary marker; and

(c)

in the case of GDA 2020, a timestamp for the datum.

(3) The coordinates of the corners of the survey area must be determined to an accuracy of less than 1 m.

(4) The relevant person must give the Minister sufficient information to enable the accuracy of the survey to be validated.

(5)

In this regulation:

relevant national datum means:

(a)

in relation to a survey for an EL or EMEL – GDA 94; and

(b)

in any other case – GDA 2020.

Research tools for this sectionPro

The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.