Modified procedure: opting in and ceasing
52BE Modified procedure: opting in and ceasing
An electrical contractor may use the modified procedure in relation to notifiable work of the electrical contractor that is part of a construction project that has already commenced if —
the electrical contractor could have done so at the beginning of the project; and
the project is unlikely to be completed within the next 6 months; and
the electrical contractor has not previously used the modified procedure in relation to the construction project.
If an electrical contractor may, under subregulation (1), use the modified procedure in relation to notifiable work and the electrical contractor and the relevant network operator have agreed to a changeover day, then on the changeover day, regulations 52BB to 52BD (with the necessary modifications) commence to apply to the electrical contractor in relation to the notifiable work.
[Regulation 52BE inserted: Gazette 8 Jan 2019 p. 16‑17.]