reg 49
In forceRegional Power Corporation’s existing capacity
49 Regional Power Corporation’s existing capacity
The Regional Power Corporation must on or before 1 May 2006 publish a description of the electricity transmission capacity utilised by that corporation, in its role as a retailer of electricity, as at 1 April 2006 and that electricity transmission capacity is to be taken to be committed to that corporation.
[Regulation 49 inserted: Gazette 31 Mar 2006 p. 1336‑7.]
Research tools for this sectionPro
The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.