Barrister AI
All legislation
WARegulation
In force
This is the latest official compilation.Check the official source →
reg 49

Regional Power Corporation’s existing capacity

In force

49 Regional Power Corporation’s existing capacity

The Regional Power Corporation must on or before 1 May 2006 publish a description of the electricity transmission capacity utilised by that corporation, in its role as a retailer of electricity, as at 1 April 2006 and that electricity transmission capacity is to be taken to be committed to that corporation.

[Regulation 49 inserted: Gazette 31 Mar 2006 p. 1336‑7.]

Research tools for this sectionPro

The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.