Barrister AI
All legislation
WARegulation
In force
This is the latest official compilation.Check the official source →
reg 49A

Contract maximum demand for existing connections

In force

49A Contract maximum demand for existing connections

The contract maximum demand in respect of an existing connection as at 1 April 2006 is the figure published in respect of the connection by a corporation on or before 1 May 2006.

[Regulation 49A inserted: Gazette 31 Mar 2006 p. 1337.]

Research tools for this sectionPro

The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.