reg 49A
In forceContract maximum demand for existing connections
49A Contract maximum demand for existing connections
The contract maximum demand in respect of an existing connection as at 1 April 2006 is the figure published in respect of the connection by a corporation on or before 1 May 2006.
[Regulation 49A inserted: Gazette 31 Mar 2006 p. 1337.]
Research tools for this sectionPro
The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.