reg 42

Summary of varied site plan for public release

In force

42 Summary of varied site plan for public release

(1)

Within 10 days after receiving notice under regulation 39(1) that the Minister has approved a draft variation under regulation 38(1)(a), the licensee must submit a summary of the approved site plan as varied to the Minister for public disclosure.

(2)

A summary submitted under subregulation (1) must include the following —

(a)

the name of the licensee;

(b)

the location or locations of the activity;

(c)

a general description of the existing subsurface conditions (baseline) identified as part of the monitoring and verification plan that may be affected by the activity;

(d)

a summary of —

(i)

the construction and layout of any facility; and

(ii)

the operational activity; and

(iii)

any risks of the activity submitted under Schedule 2 clause 4; and

(iv)

the detection and monitoring activities submitted under Schedule 2 clauses 5, 6, 7 and 8(2); and

(v)

the site closure activities submitted under Schedule 2 clause 8(1).

(3)

If the Minister is not reasonably satisfied that a summary submitted under subregulation (1) meets the criteria set out in subregulation (2), the Minister must give the licensee written notice that the licensee must modify and resubmit the summary.

(4)

Within 10 days after receiving a notice under subregulation (3), the licensee must modify and resubmit the summary of the approved site plan as varied.