Marking route of pipeline—the Act, Sch 2, cl 6
40 Marking route of pipeline—the Act, Sch 2, cl 6
A licensee for a pipeline must mark, and keep marked, the route of the pipeline as follows—
for a pipeline for high pressure gas or liquid petroleum—in accordance with AS 2885,
otherwise—by ensuring signs (pipeline signs) are in place at the relevant points for the pipeline, specified in section 41, indicating the route of the pipeline.
Maximum penalty—
for a corporation—2,000 penalty units, or
for an individual—400 penalty units.
A person must not damage or remove a mark or sign, including a pipeline sign, required by this section.
Maximum penalty—10 penalty units.
A licensee for a pipeline who removes the pipeline must remove all signs required by this section for the pipeline.
Maximum penalty—10 penalty units.
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.