(1) The Project includes —
4 (1) The Project includes —
the production of the Schematics and Design Drawings;
the demolition of the buildings on the Padbury Building Land;
the construction of the City Station Complex;
the construction of the various overpasses and walkways from Roe Street to the Carillon Land and the City Arcade Land as shown on the Schematics and which are situated on the Upper Level Reserve;
the redevelopment of the Ground Level Reserve for the purposes specified in Item 3 of the Second Schedule;
the redevelopment of the Basement Reserve as a basement for the purposes specified in Item 1 of the Second Schedule;
the alteration and relocation of existing gas, stormwater, water, sewerage, telephone and electricity services;
the installation of escalators steps and lifts for pedestrian movement between the Basement Reserve, the Ground Level Reserve and the Upper Level Reserve, and the City Station Complex and the Westrail Land; and
landscaping, installation of street furniture, signs and lighting in accordance with the Design Drawings.
4. (2) The Parties HEREBY AGREE to —
proceed with the production of the Design Drawings in accordance with this Agreement, the Schematics and the objectives and criteria in the Agreement in Principle;
do all things necessary to proceed with the implementation of the Project according to the Timetable until the Due Date; and
pay the Project Costs in their respective proportions as referred to in Clause 12.
4. (3) The State and the City shall use their best endeavours to negotiate with Australia Post for the relocation of the existing sewer.
4. (4) The City shall negotiate with each of the Interested Parties until the Due Date to agree upon the Design Drawings but only in so far as the Design Drawings directly affect each of the Interested Parties. If any of the Interested Parties do not participate in the Project then neither the State nor the City shall have any claim against the other of them arising from that non participation.
4. (5) Subject to Sub-clause (8) and Clause (9)(1) the City shall consult with the State and Westrail to agree upon the Design Drawings by 31 December 1985. If the Parties have not reached agreement to the Design Drawings by 31 December 1985 then the Design Drawings shall be referred to the Project Committee for approval.
4. (6) On the Due Date —
if the City has not been advised by each of the Interested Parties that they will participate in the Project then the Parties shall —
proceed with the Project according to the Design Drawings and the Timetable;
subject to Sub-clause (10) execute the DPA on or before 1 March 1986; and
pay the Project Costs in their respective proportions as referred to in Clause 12;
or
if the City has received advice from any of the Interested Parties that they agree to participate in the Project then the Parties and those Interested Parties shall —
proceed with the Project according to the Design Drawings and the Timetable;
subject to Sub-clause (10) execute the DPA on or before 1 March 1986; and
pay the Project Costs in their respective proportions as referred in Clause 12.