(9) Westrail shall immediately upon —
6 (9) Westrail shall immediately upon —
execution of the DPA grant the City or the State or both an easement of support over the Westrail land for the support of the City Station Complex in the form of the Deed in the Item 4 of the Sixth Schedule over the areas therein defined;
execution of this Agreement enter into a lease with the City of part of the Westrail land at a peppercorn rental for a term of ten years together with six options to renew the term for further periods of ten years each on the terms and conditions and in the form contained in Item 5 of the Sixth Schedule; and
execution of the DPA grant the City such rights of support as are within its power to grant and as may be required for the purposes of the Design Drawings over —
the Beaufort Street Bridge for the City Station Complex; and
over the Horseshoe Bridge for the West Pedestrian Overpass.
6. (10) The Minister for Railways hereby approves the granting of the easements referred to in Sub-clause (9).
6. (11) Westrail shall do all things within its power necessary to enable the State to vest in the City the City Station Complex Reserve and Westrail shall not do anything which may hinder prevent or impede the State from so vesting that Reserve.
6. (12) Within a reasonable time after the vesting of the reserves pursuant to Sub-clause (1) the State shall grant and obtain easements as may be required by the DPA.
The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.