Chapter 1 — Preliminary
Part 1 — Introduction
s 1 Short title s 2 Commencement Part 2 — Purposes and application of Act
s 3 Purposes of Act and their achievement s 4 Facilitation of Act by Petroleum and Gas (Production and Safety) Act 2004 s 5 Act binds all persons s 6 Application of Act to coastal waters of the State s 7 Relationship with Nature Conservation Act 1992 s 8 Relationship with Geothermal Act and principal mining and petroleum Acts s 8AA Relationship with Common Provisions Act s 8A Declaration for Commonwealth Act s 9 Act does not affect other rights or remedies s 10 Native title Part 3 — Interpretation
Division 1 — Dictionary
s 11 Definitions Division 2 — Key definitions
s 12 What is a GHG stream s 13 What is a GHG stream storage site s 14 What is GHG stream storage s 15 What is GHG storage exploration s 16 What is GHG storage injection testing s 17 What is a GHG stream pipeline s 18 Types of authority under Act s 19 Who is an eligible person s 20 What are the conditions of a GHG authority s 21 What are the provisions of a GHG authority s 22 What is an authorised activity for a GHG authority s 23 What is a GHG storage activity s 24 What is a work program for a GHG permit s 25 What is a development plan for a GHG lease s 26 [Repealed] s 26A What is a resource Act Part 4 — State ownership of GHG storage reservoirs
s 27 GHG storage reservoirs the property of the State s 28 Reservation in land grants Chapter 2 — GHG exploration permits Part 1 — Key authorised activities
s 29 Operation of pt 1 s 30 Principal authorised activities s 31 Incidental activities Part 2 — Obtaining GHG permits
Division 1 — Preliminary
s 32 Operation of pt 2 Division 2 — Competitive tenders
s 33 Call for tenders s 34 Right to tender s 35 Requirements for making tender s 35A Rejection of tender if tenderer disqualified s 36 Requirements for verification statement s 37 Right to terminate call for tenders Division 3 — Deciding tenders
s 38 Process for deciding tenders s 39 Provisions for preferred tenderers s 40 Deciding whether to grant GHG permit s 41 Provisions of GHG permit s 42 Criteria for decisions s 43 Notice to unsuccessful tenderers Part 3 — Area provisions
s 44 Area of GHG permit s 45 References to sub-blocks of GHG permit s 46 Minister’s power to decide excluded land s 47 Minister may add excluded land s 48 Area of GHG permit reduced on grant of GHG lease s 49 Effect of ending of declaration of potential storage area Part 4 — Work programs
Division 1 — Function and purpose
s 50 Function and purpose Division 2 — Requirements for proposed initial work programs
s 51 Operation of div 2 s 52 Program period s 53 General requirements s 54 Water issues Division 3 — Approval of proposed initial work programs s 55 Criteria s 56 Verification may be required s 57 Referral to Water Act Minister Division 4 — Requirements for proposed later work programs
s 58 Operation of div 4 s 59 General requirements s 60 Program period s 61 Implementation of evaluation program for potential storage area Division 5 — Approval of proposed later work programs
s 62 Application of div 5 s 63 GHG permit taken to have work program until decision on whether to approve proposed work program s 64 Deciding whether to approve proposed program s 65 Steps after, and taking effect of, decision Division 6 — Amending work programs
s 66 Restrictions on amending work program s 67 Applying for approval to amend s 68 Requirements for making application s 69 Deciding application s 70 Steps after, and taking effect of, decision Part 5 — Key mandatory conditions
Division 1 — Preliminary
s 71 Operation of pt 5 Division 2 — Standard relinquishment condition and related provisions
s 72 Standard relinquishment condition s 73 Consequence of failure to comply with relinquishment condition s 74 Part usually required to be relinquished s 75 Sub-blocks that can not be counted towards relinquishment s 76 Adjustments for sub-blocks that can not be counted s 77 Adjustment for particular potential storage areas s 78 Relinquishment must be by blocks s 79 Ending of GHG permit if all of its area relinquished Division 3 — Other mandatory conditions
s 80 Compliance with test plan for GHG storage injection testing s 81 Restriction on substances that may be used for GHG storage injection testing s 82 Restriction on substances that may be used for GHG stream storage s 83 Restriction on GHG streams that may be used s 84 Water Act authorisation required for taking or interference with water s 85 Obligation to consult with particular owners and occupiers s 86 Annual rent s 87 Civil penalty for non-payment of annual rent s 88 Requirement to have work program s 89 Compliance with GHG storage exploration activities in work program s 90 Penalty relinquishment if work program not finished within extended period s 91 Obligation to give proposed later work program s 92 Consequence of failure to comply with notice to give proposed later work program s 92A Power to impose or amend condition if changed holder of GHG permit Part 6 — Renewals
s 93 Conditions for renewal application s 94 Requirements for making application s 95 Continuing effect of GHG permit for renewal application s 96 Deciding application s 97 Provisions and term of renewed GHG permit s 98 Criteria for decisions s 99 Information notice about refusal s 100 When refusal takes effect Part 7 — Potential storage areas
s 101 Applying for potential storage area s 102 Deciding potential storage area application s 103 Inclusion of evaluation program in work program s 104 Term of declaration s 105 Potential storage area still part of GHG permit Part 8 — Provisions to facilitate transition to GHG lease
s 106 Application of pt 8 s 107 Ministerial direction to apply for GHG lease s 108 Taking proposed action Chapter 3 — GHG injection and storage leases Part 1 — Key authorised activities
s 109 Operation of pt 1 s 110 Principal authorised activities s 111 GHG stream pipeline and water pipeline construction and operation s 112 Incidental activities Part 2 — Transition from GHG permit to GHG lease
Division 1 — Applying for GHG lease
s 113 Who may apply s 114 Requirements for making permit-related application s 115 Rejection of permit-related application if applicant disqualified s 116 Continuing effect of GHG permit for permit-related application Division 2 — Deciding permit-related applications
s 117 Deciding whether to grant GHG lease s 118 Requirements for grant s 119 Exception for particular relevant arrangements s 120 Provisions of GHG lease s 121 Provisions about grant and conditions of GHG lease for coordinated project s 122 Information notice about refusal s 123 When refusal takes effect Part 3 — Obtaining GHG lease by competitive tender
Division 1 — Preliminary
s 124 Operation of pt 3 Division 2 — Calls for tenders
s 125 Call for tenders s 126 Right to tender s 126A Rejection of tender if tenderer disqualified s 127 Right to terminate call for tenders Division 3 — Deciding tenders
s 128 Process for deciding tenders s 129 Provisions for preferred tenderers s 130 Deciding whether to grant GHG lease s 131 Provisions of GHG lease s 132 Criteria for decisions s 133 Notice to unsuccessful tenderers Part 4 — Term and area provisions
s 134 Term of GHG lease s 135 Area of GHG lease s 136 References to sub-blocks of GHG lease s 137 Minister’s power to decide excluded land s 138 Minister may add excluded land Part 5 — Development plans
Division 1 — Function and purpose
s 139 Function and purpose Division 2 — Requirements for proposed initial development plans
s 140 Operation of div 2 s 141 General requirements s 142 Site plan s 143 Petroleum wells to be assumed s 144 Water issues s 145 Monitoring and verification plan s 146 Plan period Division 3 — Approval of proposed initial development plans s 147 Criteria for decision s 148 Verification may be required s 149 Referral to Water Act Minister Division 4 — Requirements for proposed later development plans
s 150 Operation of div 4 s 151 General requirements Division 5 — Approval of proposed later development plans
s 152 Application of div 5 s 153 GHG lease taken to have development plan until decision on whether to approve proposed development plan s 154 Deciding whether to approve proposed plan s 155 Steps after, and taking effect of, decision Division 6 — Amending development plans
s 156 Restrictions on amendment s 157 Applying for approval to amend s 158 Deciding application s 159 Steps after, and taking effect of, decision Part 6 — Key mandatory conditions for GHG leases
s 160 Operation of pt 6 s 161 Compliance with test plan for GHG storage injection testing s 162 Restriction on substances that may be used for GHG storage injection testing s 163 Restriction on substances that may be used for GHG stream storage s 164 Restriction on GHG streams that may be used s 165 Water Act authorisation required for taking or interference with water s 166 Obligation to consult with particular owners and occupiers s 167 Obligation to commence GHG stream storage s 168 Annual rent s 169 Civil penalty for non-payment of annual rent s 169A Local government rates and charges s 170 Requirement to have development plan s 171 Compliance with development plan s 172 Obligation to give proposed later development plan s 173 Consequence of failure to comply with notice to give proposed later development plan s 173A Power to impose or amend condition if changed holder of GHG lease Part 7 — Surrenders
s 174 When surrender is permitted s 175 Part of GHG lease area can not be surrendered s 176 Timing of surrender application s 177 Requirements for making surrender application s 178 Minister may require further report or work for surrender of GHG lease s 179 Deciding application s 180 Notice and taking effect of decision s 181 Responsibility for injected GHG streams after decommissioning Chapter 4 — Coordination with particular authorities under other resource Acts
Part 1 — Preliminary
s 182 Relationship with chs 2, 3 and 5 s 183 What is an overlapping resource authority s 184 What is an exploration authority (non-GHG) s 185 Relationship with other resource Acts and overlapping resource authorities Part 2 — Coordination arrangements for GHG leases
s 186 GHG coordination arrangements that may be made s 187 Other provisions about and effect of GHG coordination arrangement s 188 Applying for ministerial approval of proposed GHG coordination arrangement s 189 Ministerial approval of proposed GHG coordination arrangement s 190 Approval does not confer right to surrender or renew s 191 Grant of pipeline licence s 192 Amendment or cancellation by parties to arrangement s 193 Minister’s power to cancel arrangement s 194 Cancellation does not affect relevant leases Part 3 — Obtaining GHG lease if overlapping authority
Division 1 — Preliminary
s 195 Application of pt 3 Division 2 — Requirements for application
s 196 Requirements for making application s 197 Content requirements for GHG statement Division 3 — Consultation provisions
s 198 Applicant’s information obligation s 199 Submissions by overlapping resource authority holder Division 4 — Resource management decision
s 200 Application of div 4 s 201 Resource management decision s 202 Criteria for decision s 203 Restrictions on giving overlapping authority priority Division 5 — Process if resource management decision is to give overlapping authority priority
s 204 Application of div 5 s 205 Notice to applicant and overlapping authority holder s 206 Relevant lease application for all of the land s 207 Relevant lease application for part of the land s 208 No relevant lease application Division 6 — Resource management decision not to grant and not to give priority
s 209 Lapsing of application Division 7 — Deciding application
s 210 Application of div 7 s 211 Application may be refused if no reasonable prospects of GHG coordination arrangement s 212 Additional criteria for deciding provisions of GHG lease s 213 Publication of outcome of application Part 4 — Priority to particular lease applications
s 214 Earlier geothermal, mining or petroleum lease application s 215 Proposed geothermal, mining or petroleum lease for which EIS approval given s 216 Proposed geothermal, mining or petroleum lease declared a coordinated project Part 5 — GHG lease applications in response to invitation under resource Act
s 217 Application of pt 5 s 218 Additional ground for refusing application Part 6 — Additional provisions for GHG authorities
Division 1 — Restrictions on authorised activities other than for GHG leases
s 219 Overlapping geothermal, mining or petroleum lease s 220 Overlapping exploration authority (non-GHG) s 221 Resolving disputes Division 2 — Additional conditions
s 222 Notice of grant by particular GHG authority holders s 223 Condition to notify particular other authority holders of proposed start of particular authorised activities s 224 Continuance of GHG coordination arrangement after transfer Division 3 — Restriction on Minister’s power to amend GHG lease if overlapping authority
s 225 Interests of overlapping authority holder to be considered Part 7 — Additional provisions for development plans if overlapping authority
s 226 Operation of pt 7 s 227 Statement about interests of overlapping authority holder s 228 Consistency with overlapping resource authority’s development plan and with any relevant coordination arrangement s 229 Additional criteria for approval Part 8 — Additional provisions for safety management plans
s 230 Grant of GHG lease does not affect obligation to make plan s 231 Requirements for consultation with particular overlapping resource authority holders s 232 Application of P&G Act provisions for resolving disputes about reasonableness of proposed provision Chapter 5 — General provisions for GHG authorities
Part 1 — GHG injection and storage data acquisition authorities
Division 1 — Obtaining authority
s 233 Who may apply for GHG data acquisition authority s 234 Requirements for making application s 235 Deciding application s 236 Provisions of authority s 237 Notice of refusal Division 2 — Provisions for GHG data acquisition authorities
s 238 Key authorised activities s 239 Additional condition of relevant GHG tenure s 240 Authority holder is the relevant GHG tenure holder from time to time s 241 Authority ends if relevant GHG tenure ends s 242 Relationship with subsequent GHG tenure s 243 Annual rent s 244 End of authority report for GHG data acquisition authority Part 2 — GHG storage viability assessment
s 245 Minister’s power to require GHG storage viability report s 246 Required content of GHG storage viability report s 247 Minister’s power to obtain independent viability assessment s 248 Costs of independent viability assessment Part 3 — Ownership and decommissioning of GHG stream pipelines
s 249 Application of pt 3 s 250 General provision about ownership while tenure is in force for pipeline s 251 Ownership afterwards s 252 Obligation to decommission pipelines on cessation or reduction of tenure Part 4 — Reporting and information provisions
Division 1 — General reporting provisions
s 253 Requirement of GHG tenure holder to report outcome of GHG storage injection testing s 254 Monitoring reports by GHG lease holder s 255 Relinquishment report by GHG permit holder s 256 End of tenure report s 257 Power to require information or reports about authorised activities to be kept or given Division 2 — Records and samples
s 258 Requirement to keep records and samples s 259 Requirement to give records and samples Division 3 — Releasing required information
s 260 Meaning of required information s 261 Public release of required information s 262 Chief executive may use required information Part 5 — General provisions for wells
Division 1 — Responsibility for wells
s 263 Former petroleum wells assumed by GHG tenure holder s 264 Requirements for drilling GHG well Division 2 — Decommissioning of wells
s 265 Application of div 2 s 266 Restriction on decommissioning well s 267 Obligation to decommission s 268 Right of entry to facilitate decommissioning for GHG permit s 269 Responsibility for well after decommissioning Part 6 — Security
s 270 Operation and purpose of pt 6 s 271 Power to require security for GHG authority s 272 Minister’s power to require additional security s 273 Interest on security s 274 Power to use security s 275 Replenishment of security s 276 Security not affected by change in authority holder s 277 Retention of security after GHG authority ends Part 7 — [Repealed]
Division 1 — [Repealed]
Subdivision 1 — [Repealed]
s 278 [Repealed] s 279 [Repealed] s 280 [Repealed] s 281 [Repealed] s 282 [Repealed] Subdivision 2 — [Repealed]
s 283 [Repealed] s 284 [Repealed] s 285 [Repealed] Division 2 — [Repealed]
Subdivision 1 — [Repealed]
s 286 [Repealed] Subdivision 2 — [Repealed]
s 287 [Repealed] s 288 [Repealed] s 289 [Repealed] s 290 [Repealed] s 291 [Repealed] s 292 [Repealed] Subdivision 3 — [Repealed]
s 293 [Repealed] s 294 [Repealed] s 295 [Repealed] Division 3 — [Repealed]
s 296 [Repealed] s 297 [Repealed] Division 4 — [Repealed]
s 298 [Repealed] Division 5 — [Repealed]
s 299 [Repealed] Part 8 — [Repealed]
Division 1 — [Repealed]
Subdivision 1 — [Repealed]
s 300 [Repealed] s 301 [Repealed] Subdivision 2 — [Repealed]
s 302 [Repealed] s 303 [Repealed] s 304 [Repealed] Division 2 — [Repealed]
s 312 [Repealed] s 313 [Repealed] s 314 [Repealed] s 315 [Repealed] Part 9 — [Repealed]
s 316 [Repealed] s 317 [Repealed] s 318 [Repealed] Part 10 — [Repealed]
Division 1 — [Repealed]
Subdivision 1 — [Repealed]
s 319 [Repealed] Subdivision 2 — [Repealed]
s 320 [Repealed] Subdivision 3 — [Repealed]
s 321 [Repealed] s 322 [Repealed] Subdivision 4 — [Repealed]
s 323 [Repealed] s 324 [Repealed] s 324A [Repealed] s 325 [Repealed] s 325A [Repealed] s 325AB [Repealed] Subdivision 5 — [Repealed]
s 325B [Repealed] s 325C [Repealed] s 325D [Repealed] Subdivision 6 — [Repealed]
s 325DA [Repealed] s 325DB [Repealed] s 325DC [Repealed] Subdivision 7 — [Repealed]
s 325E [Repealed] Division 2 — [Repealed]
s 325F [Repealed] s 325G [Repealed] s 325H [Repealed] s 325I [Repealed] s 325J [Repealed] s 325K [Repealed] s 325L [Repealed] Part 11 — Ownership of equipment and improvements
s 326 Application of pt 11 s 327 Ownership of equipment and improvements Part 12 — General provisions for conditions and authorised activities
Division 1 — Other mandatory conditions for all GHG authorities
s 328 Operation of div 1 s 329 Compliance with land access code s 330 Requirement to consider using formed roads s 331 Obligation to comply with Act and prescribed standards s 332 Obligation to survey if Minister requires s 333 Notice of petroleum discovery Division 2 — General provisions for when authority ends or area reduced
s 334 Obligation to remove equipment and improvements s 335 Authorisation to enter to facilitate compliance Division 3 — Provisions for authorised activities
s 336 Authorised activities may be carried out despite rights of owner or occupier s 337 General restrictions on right to carry out authorised activity s 338 Who may carry out authorised activity for GHG authority holder s 338A Limitation of owner’s or occupier’s tortious liability for authorised activities Part 13 — GHG register
s 339 GHG register s 340 Keeping of register s 341 Access to register s 342 Arrangements with other departments for copies from GHG register s 343 Supply of statistical data from GHG register s 344 Chief executive may correct register Part 14 — Dealings
Division 1 — Preliminary
s 345 Definitions for pt 14 s 346 What is a dealing with a GHG authority s 347 Prohibited dealings s 348 Types of transfers Division 2 — Registration of dealings generally
s 349 Registration required for all dealings s 350 Obtaining registration s 351 Effect of approval and registration Division 3 — Approval of assessable transfers
s 352 Indicative approval s 353 Applying for approval of assessable transfer s 354 Deciding application s 355 Security may be required s 355A Notice of decision Part 14A — Recording associated agreements
s 355B Definition for pt 14A s 355C Recording associated agreements s 355D Effect of recording associated agreements Part 14B — Caveats
s 355E Requirements of caveats s 355F Lodging of caveat s 355G Chief executive’s functions on receipt of caveat s 355H Effect of lodging caveat s 355I Lapsing, withdrawal or removal of caveat s 355J Further caveat not available to same person s 355K Compensation for lodging caveat without reasonable cause Part 15 — Enforcement of end of authority and area reduction obligations
s 356 Power of authorised person to ensure compliance s 357 Requirements for entry to ensure compliance s 358 Duty to avoid damage in exercising remedial powers s 359 Notice of damage because of exercise of remedial powers s 360 Compensation for exercise of remedial powers s 361 Ownership of thing removed in exercise of remedial powers s 362 Recovery of costs of and compensation for exercise of remedial power Part 16 — Dealing with serious situations
s 363 What is a serious situation s 364 Minister’s power to give direction s 365 Requirements for giving serious situation direction s 366 Failure to comply with serious situation direction s 367 Serious situation direction applies despite other instruments s 368 Powers under P&G Act not affected Part 17 — Miscellaneous provisions
s 369 GHG authority does not create an interest in land s 369A Extinguishing GHG interests on the taking of land in a GHG authority’s area (other than by an easement) s 369B Effect of extinguishment of GHG interests on the taking of land in a GHG authority’s area (other than by taking an easement) s 369C Applications relating to land taken under a resumption law for which GHG interests were extinguished s 369D Compensation for effect of taking of land in a GHG authority’s area on GHG interests s 370 Joint holders of a GHG authority s 371 Minister’s power to ensure compliance by GHG authority holder s 372 Interest on amounts owing to the State s 373 Recovery of unpaid amounts s 374 Power to correct or amend authority s 375 [Repealed] s 376 Joint and several liability for conditions and for debts to State s 377 Notice of authority holder’s agents Chapter 6 — Investigations and enforcement
Part 1A — [Repealed]
Division 1 — [Repealed]
s 377A [Repealed] Division 2 — [Repealed]
s 377B [Repealed] s 377C [Repealed] s 377D [Repealed] Division 3 — [Repealed]
s 377E [Repealed] s 377F [Repealed] s 377G [Repealed] Part 1 — Noncompliance action for GHG authorities
Division 1 — Preliminary
s 378 Operation of div 1 Division 2 — Noncompliance action by Minister
s 379 Types of noncompliance action that may be taken s 380 When noncompliance action may be taken Division 3 — Procedure for noncompliance action
s 381 Notice of proposed noncompliance action s 382 Considering submissions s 383 Decision on proposed noncompliance action s 384 Notice and taking effect of decision s 385 Consequence of failure to comply with relinquishment requirement Part 2 — General offences
Division 1 — Restrictions relating to GHG storage activities
s 386 Restriction on GHG storage activities s 387 GHG tenure holder’s measurement obligations s 388 Duty to avoid interference in carrying out GHG storage activities Division 2 — Interference with authorised activities
s 389 Obstruction of GHG authority holder s 390 Restriction on building on pipeline land for GHG tenure s 391 Restriction on changing surface of pipeline land for a GHG tenure Division 3 — Other offences
s 392 False or misleading information s 393 Liability of executive officer—offence committed by corporation against s 386(1) s 393A Executive officer may be taken to have committed offence s 394 Attempts to commit offences Part 3 — Appeals
s 395 Who may appeal s 396 Period to appeal s 397 Starting appeal s 398 Stay of operation of decision s 399 Hearing procedures s 400 Land Court’s powers on appeal s 401 Restriction on Land Court’s powers for decision not to grant GHG lease s 402 [Repealed] Part 4 — Evidence and legal proceedings
Division 1 — Evidentiary provisions
s 403 Application of div 1 s 404 Authority s 405 Signatures s 406 Other evidentiary aids Division 2 — Offence proceedings
s 407 Offences under Act are summary s 408 Statement of complainant’s knowledge s 409 Conduct of representatives s 410 Additional orders that may be made on conviction Chapter 7 — Miscellaneous provisions
Part 1 — Applications, lodging documents and making submissions
s 411 Place or way for making applications, lodging documents or making submissions s 412 Requirements for making an application s 413 Request to applicant about application s 413A Refusing application for failure to comply with request s 413B Notice to progress GHG authority or renewal application s 414 Particular criteria generally not exhaustive s 415 Particular grounds for refusal generally not exhaustive s 416 Amending applications s 417 Withdrawal of application s 418 Minister’s power to refund application fee Part 2 — Other miscellaneous provisions
s 419 General public interest criteria for ministerial decisions s 420 Provision for entry by State to carry out GHG storage activity s 421 Name and address for service s 422 Additional information about reports and other matters s 423 References to right to enter s 424 Application of provisions s 425 Protection from liability for particular persons s 426 Delegation by Minister or chief executive s 427 [Repealed] s 428 Approved forms s 429 Regulation-making power Chapter 8 — Transitional provisions
Part 1 — Transitional provisions for Act No. 3 of 2009
s 430 Definitions for pt 1 s 431 Conversion of Zerogen’s P&G Act ATPs s 432 New GHG permit for Zerogen s 432A Correction of new GHG permit for Zerogen s 433 Authorised activities under Zerogen GHG permits may start from assent s 434 Deciding provisions of new GHG permit s 435 Test plan for new GHG permit s 436 Functions under part may be performed before assent Part 2 — Transitional provisions for amendments under Geothermal Energy Act 2010
s 437 Land access code prevails over conditions s 438 Existing compensation agreements other than for notifiable road uses s 439 Existing entry notices s 440 References to geothermal tenure Part 3 — Transitional provisions for Mines Legislation (Streamlining) Amendment Act 2012
Division 1 — Preliminary
s 441 Definitions for pt 3 Division 2 — Transitional provisions for amendments in amending Act commencing on assent
s 442 Land in a GHG authority’s area taken before the commencement s 443 Land in a GHG authority’s area for which notice of intention to resume given before the commencement Division 3 — Transitional provisions for amendments in amending Act commencing by proclamation
s 444 Undecided applications for approval of particular dealing s 445 Deciding applications for approval of assessable transfers until commencement of particular provisions s 446 Uncommenced appeals about refusal to approve particular dealing s 447 Unfinished appeals about refusal to approve particular dealing Part 4 — Transitional provisions for Mineral and Energy Resources (Common Provisions) Act 2014
s 448 Continued appeal right for particular decisions s 449 Existing practice manuals Part 5 — Transitional provisions for Mineral and Energy Resources and Other Legislation Amendment Act 2020
s 450 Power to impose or amend condition if changed holder of GHG permit or GHG lease s 451 Conferences with eligible claimants or owners or occupiers started before commencement Part 6 — Transitional provision for Coal Mining Safety and Health and Other Legislation Amendment Act 2022
s 452 Application of new s 379 to noncompliance action Part 7 — Transitional provisions for Mineral and Energy Resources and Other Legislation Amendment Act 2024
Division 1 — Preliminary
s 453 Definitions for part Division 2 — Provisions for ending of EPQ10
s 454 Ending of EPQ10 s 455 Reporting and record keeping requirements s 456 Decommissioning of wells s 457 Removal of equipment and improvements s 458 Enforcement of end of authority and area reduction obligations s 459 Right of entry to facilitate decommissioning of wells and removal of equipment and improvements s 460 Withdrawal of particular requests and applications Division 3 — Other provisions
s 461 Withdrawal of undecided applications for proposed GHG permits s 462 No compensation payable by the State s 463 Transitional regulation-making power Part 8 — Transitional provisions for Greenhouse Gas Storage Amendment Act 2025
Division 1 — Preliminary
s 464 Definitions for part s 465 Purpose of part Division 2 — Modification of end of tenure report
s 466 Modification of obligation to give former EPQ10 end of tenure report Division 3 — Modification of obligation to decommission—general
s 467 Modification of obligation to decommission relevant GHG well s 468 Modification of responsibility for relevant GHG well after decommissioning Division 4 — Conversion of relevant GHG wells
s 469 Modification of right of entry to facilitate decommissioning of relevant GHG well s 470 Works carried out to convert relevant GHG well into water supply bore taken to be water bore drilling activities s 471 Particular development taken to be accepted development s 472 Partial compliance with conversion requirements under s 467 Division 5 — Transfer of converted water supply bores
s 473 Application of division s 474 Transfer of water supply bore to landowner s 475 Effect of transfer s 476 Notice of transfer to Water Act regulator Division 6 — Other matters relating to converted water supply bores
s 477 Conversion report s 478 Restriction on transfers of converted water supply bores s 479 Water licence to take water for stock purposes Division 7 — Other provisions
s 480 Relevant GHG well taken to be operating plant despite ending of former EPQ10 s 481 No compensation payable by the State s 482 Limited right of entry to comply with rehabilitation conditions Division 8 — Transitional regulation-making power
s 483 Transitional regulation-making power Schedule 1 — Decisions subject to appeal Schedule 2 — Dictionary