Barrister AI
All legislation
WARegulation
In force
This is the latest official compilation.Check the official source →
reg 10

Duty to reduce effect of interruption

In force

10 Duty to reduce effect of interruption

(1)

A transmitter or distributor must, so far as is reasonably practicable, reduce the effect of any interruption on a customer.

(2)

Without limiting subsection (1), a transmitter or distributor must consider whether the transmitter or distributor should supply electricity by alternative means to a customer who will be affected by a proposed interruption if —

(a)

the interruption is expected to exceed the relevant period under section 11(2);

(b)

the effect of the interruption on the customer’s business is likely to be substantial; or

(c)

the transmitter or distributor is aware that a person living in the customer’s premises has special health needs and requires electricity for the operation of equipment that caters to those needs.

Research tools for this sectionPro

The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.