Floodplain harvesting—certification of accuracy
103 Floodplain harvesting—certification of accuracy
A duly qualified person who checks point-of-intake metering equipment for a water supply work for accuracy under Schedule 5, section 9 must give a certificate to the person for whom the check is undertaken certifying whether or not the maximum permissible error of the metering equipment exceeds plus or minus 5% in the field.
A duly qualified person who checks storage metering equipment for a water supply work for accuracy under Schedule 5, section 9 must give a certificate to the person for whom the check is undertaken certifying whether or not the maximum permissible error of the metering equipment exceeds plus or minus 10mm in the field.
The duly qualified person must give the certificate—
in the approved form and manner, and
within 7 days after the certification.
Maximum penalty for subsection (3)—100 penalty units.
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.