Chapter 1 — Preliminary
Part 1 — Introductory provisions
s 1 Short title Part 2 — Objects of Act
s 3 Objects of Act Part 3 — Dictionary
s 4 Definitions—the dictionary s 4A Part 4 — Some basic concepts of electricity industry operations
s 5 Electricity s 6 Transmission grid s 7 Regional system control s 8 Supply network s 9 Network control s 10 Network services s 11 Ancillary services s 12 Works, substations and operating works s 13 Meaning of electrical equipment s 14 Meaning of electrical installation s 15 Meaning of electric line s 16 Meaning of associated equipment for electric line s 16A Meaning of meter s 17 Voltage Part 5 — Operation of Act
s 18 Application of Act to government entities s 18A Declaration for Commonwealth Act s 19 Act subject to certain laws Part 6 — Exemptions from Act
Division 1 — On-suppliers
Subdivision 1 — Preliminary
s 20 Definitions for div 1 Subdivision 2 — Exemptions
s 20A Exemptions for on-suppliers Subdivision 3
s 20B s 20C Subdivision 4
s 20D s 20E s 20F s 20G Subdivision 5 — Individual metering
s 20H Individual metering option s 20I Compensation for installation damage s 20J Subdivision 6
s 20K s 20L s 20M s 20N Subdivision 7 — On-suppliers who operate a private network
s 20O National Electricity Rules exemption required Division 2 — Other exemptions
s 20P Exemption for connection of generating plant not supplying electricity to transmission grid or supply network s 20Q Exemptions for rail government entities, railway managers and their related bodies corporate s 20QA Exemptions for light rail franchisee and light rail manager s 20R Regulation may exempt person or thing from Act Chapter 2 — The electricity industry
Part 1 — Electricity industry and entities
s 21 Electricity industry s 22 Electricity entities Part 2 — Customers
s 23 Customers and their types s 23A s 24 Customers authorised to take electricity from transmission grid or supply network Part 3 — Generation entities and their authorities
s 25 Generation entities s 26 Generation authorities s 27 Conditions of generation authority s 28 Additional condition to comply with protocols, standards and codes Part 4 — Transmission entities and their authorities
s 29 Transmission entities s 30 Transmission authorities s 31 Conditions of transmission authority s 32 Additional condition to allow connection to grid by complying persons s 33 Additional condition not to buy and sell electricity s 34 Additional conditions about grid operation etc. s 35 Additional condition to provide network services s 36 Additional condition to comply with protocols, standards and codes s 36A Responsibility for regional system control Part 5 — Distribution entities and their authorities
Division 1 — Preliminary
s 37 Distribution entities s 38 Distribution authorities s 39 Distribution area of distribution entity Division 2
s 40 s 40AA s 40A s 40B s 40BA s 40C s 40D Division 3
Subdivision 1
s 40DA Subdivision 2
s 40DB Subdivision 3
s 40DC s 40DD s 40DE s 40DF Division 4 — Customers’ premises outside of distribution area
s 40E s 40F s 40G s 40H s 41 Connection and supply of electricity outside distribution area Division 5 — Conditions of distribution authorities
s 42 Conditions of distribution authority s 43 Additional condition to allow connection to supply network by complying persons s 44 Additional condition to provide network services s 44A Additional condition to allow credit for electricity produced by small photovoltaic generators s 45 Additional condition to comply with protocols, standards and codes s 45A Responsibility for network control Part 6 — Retailers Part 6 — Retailers
s 46 s 47 s 48 s 48A s 48B s 48C s 48D s 48E s 48F s 48G s 48H s 48I s 49 s 49A s 50 s 51 s 51A s 51AA s 52 s 52A s 53 s 54 s 55 s 55A s 55B s 55C s 55CA s 55D s 55DA Retailer must enter into community services agreement s 55DB Electricity produced by qualifying generator s 55DBA Electricity produced by small photovoltaic generator s 55DC s 55E s 55F s 55GA s 55G Part 6A — Coordination agreements between distribution and retail entities
s 55H Negotiation of coordination agreement s 55I Standard coordination agreement Part 7 — Special approval holders and their approvals
s 56 Purpose of special approvals s 57 Special approval holders s 58 Special approvals s 59 Authorisation given by special approval s 60 Conditions of special approval s 61 Additional condition to comply with protocols, standards and codes s 61A s 61B Additional condition for electricity produced by photovoltaic generators Part 8 — Regulator
s 62 Regulator s 63 Functions s 64 Delegation s 64A Review of feed-in tariff provisions s 64AA Part 9 — Electricity officers
s 64B Definition for pt 9 s 64C s 64D s 64E s 64F s 64FA s 64FB s 64FC s 64FD s 64FE s 64G s 64H s 64I s 64J s 64K s 64L s 64M s 64N s 64O s 64P s 64Q s 64R s 64S s 64T s 65 Appointment s 66 Limitation of electricity officer’s powers s 67 Other limitation of electricity officer’s powers s 68 Electricity officer’s appointment conditions s 69 Electricity officer’s identity card s 70 Production or display of electricity officer’s identity card Part 10
s 71 s 72 s 73 s 74 s 75 Part 11
s 76 s 77 s 78 s 79 s 80 Part 12
s 81 s 81A Chapter 3
s 82 s 83 s 84 s 85 s 86 Chapter 4 — Electricity industry operations
Part 1 — Restriction on certain activities by unauthorised persons
s 87 Connection of generating plant to transmission grid or supply network only if authorised s 88 Prohibition on operating transmission grid unless authorised s 88A Prohibition on operating supply network unless authorised s 89 Part 2 — Market operation
Division 1 — Preliminary
s 89A Definitions for pt 2 Division 2 — Market monitoring, reporting and review in designated retail market areas
s 89B Market monitoring direction and report s 89C Obtaining information to comply with direction s 89D Competition review Division 3 — Price determination
s 89E Non-application to sales in designated retail market area s 90 Deciding prices for standard contract customers s 90AAA s 90AA Delegation to QCA and terms of reference s 90AB Publication of notified prices s 90A Obtaining information for price determination s 91 Retailers charging for GST s 91A Retailer must comply with notification or direction s 91AA Provision for compliance with decisions about notified prices Division 4 — Reintroduction of price determination
s 91B Reserve power of Minister to reintroduce price determination s 91C s 91D s 91E s 91F s 91G Part 2A — Feed-in tariff
s 92 Definitions for pt 2A s 92A s 92B s 92C s 92D s 92E s 92F s 92G s 92H s 92I s 92J s 92K s 92L s 92M s 92N s 93 Minister to direct QCA to decide feed-in tariff s 94 QCA to publish feed-in tariff s 95 When feed-in tariff continues to apply s 96 Part 3 — Limitation of liability of electricity entities
s 97 Limitation of liability of electricity entities and special approval holders that are not Registered participants s 97A Limitation of liability for National Electricity (Queensland) Law Part 4 — Works
Division 1 — Works generally
s 98 Electricity entity entitled to access to its works s 99 Person to give notice of work affecting electricity entity’s works Division 2 — Works on public places, other than railway land and protected areas
s 100 Application of division s 101 Electricity entity may take action in publicly controlled places to provide electricity etc. s 102 Works on roads s 103 Electricity entity to consult with road authority before replacing works s 104 Regulation may declare restricted road s 105 Electricity entity to comply with road authority’s agreement etc. s 106 Public entity may require electricity entity to alter position of works Division 3 — Works on railway land
s 107 Agreement for works of electricity entities affecting railways s 108 Removal of works s 109 Works impairing railway signalling or communication lines s 110 Building by railway operator of signalling or communication line likely to be affected by electricity entity’s works etc. Division 4 — Works on protected areas
s 111 Building of works on protected areas Division 4A
s 111A s 111B s 111C s 111D s 111E s 111F s 111G Division 5 — Other matters about an electricity entity’s works
s 112 Future owner or occupier of place taken to have consented to building of works s 112A Clearing vegetation on freehold land for operating works s 113 Works remain property of electricity entity s 113A Authority to transmit over land s 113B Authority to supply over land s 114 Compensation payable by electricity entity for damage etc. Part 5 — Entry onto and acquisition of land
Division 1 — Entry onto land
s 115 Authority to enter onto land for proposed works etc. Division 2 — Acquisition of land
s 116 Authority to take land s 116A Authority to create easements over forest land s 116B Easements to include carriage services Part 6 — Miscellaneous
s 117 Resolution of certain disputes between electricity entities or between electricity entities and public entities s 118 s 118A Distribution entity may recover amount for connection and supply of electricity to a person s 119 s 119A Chapter 5 — Industry regulation
Part 1 — Regulator
s 120 Regulator’s power to require information from electricity entities or retailers s 120AA Regulator’s powers concerning audit of compliance with Act etc. s 120AB Responsibility for cost of audit s 120AC Independent auditor may require reasonable help or information s 120AD Audit report and submissions on report s 120AE Disclosure of information Part 1A — Distribution network codes
Division 1 — Preliminary
s 120A Definition for pt 1A Division 2 — Initial distribution network codes
s 120B Making of initial distribution network codes by Minister s 120C Specific matters for which code may provide s 120D Gazettal and taking of effect of code s 120E Tabling of code Division 3 — QCA distribution network codes
s 120F QCA may make distribution network code s 120G QCA code objective s 120GA s 120GB s 120H Required consultation s 120I Ministerial approval s 120J When approved QCA distribution network code takes effect s 120K Tabling of QCA distribution network code Division 4 — Review of distribution network codes and related matters
s 120L Direction by Minister to review s 120M Terms of reference s 120N Notice of review or amended term of reference or direction s 120NA s 120NB s 120O Conduct of review Division 5 — Amending distribution network codes
s 120P Application of div 5 s 120PA Required consultation for amendment s 120PB Application of div 3 other than its consultation provision Division 6 — Enforcing distribution network codes
Subdivision 1 — Code contravention notices
s 120Q Application of sdiv 1 s 120R Criteria for deciding material contravention s 120S Warning notice may be given s 120T Requirements for warning notice s 120U Considering submissions on warning notice s 120V Giving of code contravention notice s 120W Duration of code contravention notice Subdivision 2 — Proceedings
s 120X Proceeding for civil penalty order s 120Y How order enforced s 120Z Injunctions s 120ZA Conduct by directors, servants or agents Subdivision 3 — Referrals to regulator
s 120ZB When QCA must refer material contravention s 120ZC When QCA may refer material contravention s 120ZCA s 120ZD Guidelines for exercise of QCA powers for civil penalties Subdivision 4 — Production of documents or information
s 120ZE Notice to produce documents or information s 120ZF Disclosure of information to regulator s 120ZG Protection of confidential information given for investigation Subdivision 5 — Audits
s 120ZH QCA’s powers concerning audit of compliance with distribution network code s 120ZI Responsibility for cost of audit s 120ZJ Independent auditor may require reasonable help or information s 120ZK Audit report and submissions on report Division 7 — Miscellaneous provisions
s 120ZL Relationship with Fair Trading Act 1989 s 120ZM Part 1B
s 120ZN s 120ZO Part 1C
Division 1
s 120ZP s 120ZQ s 120ZR Division 2
s 120ZS s 120ZT s 120ZU s 120ZV s 120ZW s 120ZX Division 3
s 120ZY s 120ZZ s 120ZZA s 120ZZB s 120ZZC s 120ZZD s 120ZZE s 120ZZF s 120ZZG Part 2 — Restrictions and rationing
Division 1 — Electricity restriction regulations
s 121 Purpose of electricity restriction regulations s 122 Electricity restriction regulations s 123 Division 2 — Emergency rationing orders
s 124 Making of emergency rationing orders s 125 Making of emergency rationing orders other than by gazette notice s 126 What order may provide s 127 Advertisement of order s 128 Period of operation of order s 129 Emergency rationing order prevails over existing agreements with customers Division 3 — Limitation on restrictions and rationing
s 129A Limitation for Stanwell Magnesium Plant s 129B Expiry of div 3 Part 3 — Action by regulator to ensure supply of electricity by electricity entities
s 130 Governor in Council may authorise regulator to take over operation of relevant operations s 131 Effect of regulator taking over operation of relevant operations Part 3A
s 131A Part 4 — Disciplinary action against electricity entities
s 132 Grounds for disciplinary action s 133 Types of disciplinary action s 133A s 134 Procedure for disciplinary action s 135 Penalty recoverable as debt Part 5 — Enforcing sections 55DA(1), 55DB(1) and 55DBA(2) against retailers
Division 1 — Contravention notices
s 135AA Application of pt 5 s 135AB Criteria for deciding material contravention s 135AC Warning notice may be given s 135AD Requirements for warning notice s 135AE Considering submissions on warning notice s 135AF Giving of contravention notice s 135AG Duration of contravention notice Division 2 — Proceedings
s 135AH Proceeding for civil penalty order s 135AI How order enforced s 135AJ Injunctions s 135AK Conduct by directors, servants or agents Division 3 — Production of documents or information
s 135AL Notice to produce documents or information Chapter 5A
Part 1
Division 1
s 135A Part 2
Division 1
s 135AM s 135AN s 135AO s 135AP s 135AQ s 135AR s 135AS Division 2
s 135AT Division 3
s 135AU s 135AV s 135AW s 135AX s 135AY s 135AZ s 135B s 135BA s 135BB s 135BC s 135BD s 135BE s 135BF s 135BG s 135BH s 135BI Division 4
Subdivision 1
s 135BJ s 135BK s 135BL Subdivision 2
s 135BM s 135BN s 135BO Division 5
Subdivision 1
s 135BP s 135BQ Subdivision 2
s 135BR Subdivision 3
s 135BS s 135BT s 135BU s 135BV s 135BW s 135BX s 135BY s 135BZ s 135C Part 3
Division 1
Subdivision 1
s 135CA Subdivision 2
s 135CB s 135CC s 135CD s 135CE s 135CF Subdivision 3
s 135CG s 135CH s 135CI s 135CJ Division 2
s 135CK s 135CL Division 3
s 135CM s 135CN s 135CO s 135CP s 135CQ Division 4
s 135CR s 135CS s 135CT s 135CU Division 5
Subdivision 1
s 135CV s 135CW Subdivision 2
s 135CX s 135CY s 135CZ s 135D Subdivision 3
s 135DA Subdivision 4
s 135DB s 135DC s 135DD Part 4
Division 1
s 135DE s 135DF s 135DG s 135DH s 135DI s 135DJ s 135DK s 135DL s 135DM s 135DN Division 1A
s 135DNA Division 2
s 135DO s 135DP s 135DQ s 135DR Division 3
s 135DS s 135DT Division 4
Subdivision 1
s 135DU s 135DV s 135DW s 135DX Subdivision 2
s 135DY s 135DZ s 135E Subdivision 3
s 135EA s 135EB s 135EC s 135ED s 135EE Division 5
Subdivision 1
s 135EF Subdivision 2
s 135EG Subdivision 3
s 135EH s 135EI s 135EJ s 135EK s 135EL Part 5
Division 1
s 135ELA s 135EM Division 2
Subdivision 1
s 135EN s 135EO s 135EP s 135EQ Subdivision 2
s 135ER s 135ES s 135ET Subdivision 3
s 135EU s 135EV s 135EW Division 3
s 135EX s 135EY s 135EZ s 135F s 135FA s 135FB s 135FC Division 4
Subdivision 1
s 135FD s 135FE s 135FF Subdivision 2
s 135FG s 135FH s 135FI s 135FJ s 135FK s 135FL s 135FM s 135FN Subdivision 3
s 135FO s 135FP Subdivision 4
s 135FQ Division 5
Subdivision 1
s 135FR s 135FS s 135FT s 135FU s 135FV s 135FW Subdivision 2
s 135FX s 135FY s 135FZ s 135G s 135GA s 135GB s 135GC s 135GD s 135GE s 135GF Division 6
Subdivision 1
s 135GG s 135GH Subdivision 2
s 135GI s 135GJ s 135GK s 135GL s 135GM s 135GN s 135GO s 135GP s 135GQ Subdivision 3
s 135GR s 135GS s 135GT s 135GU s 135GV s 135GW s 135GX s 135GY Subdivision 4
s 135GZ s 135H s 135HA s 135HB s 135HC s 135HD s 135HE Subdivision 5
s 135HF s 135HG Subdivision 6
s 135HH s 135HI s 135HJ Subdivision 7
s 135HK Subdivision 8
s 135HL s 135HM s 135HN s 135HO s 135HP Subdivision 9
s 135HQ s 135HR s 135HS s 135HT Division 7
s 135HU s 135HV s 135HW s 135HX s 135HY s 135HZ Part 6
s 135I s 135IA s 135IB s 135IC s 135ID s 135IE Part 7
Division 1
s 135IF s 135IG s 135IH s 135II s 135IJ s 135IK s 135IL s 135IM s 135IN Division 2
s 135IO s 135IP s 135IQ s 135IR s 135IS Division 3
s 135IT s 135IU Division 4
s 135IV s 135IW Part 8
Division 1
s 135IX s 135IY s 135IZ s 135J Division 2
s 135JA s 135JB s 135JC s 135JD Division 3
s 135JE s 135JF s 135JG s 135JH s 135JI s 135JJ s 135JK Division 4
s 135JL s 135JM s 135JN s 135JO s 135JP s 135JQ s 135JR Division 5
s 135JS s 135JT s 135JU s 135JUA s 135JV Part 9
s 135JW s 135JX Chapter 6 — Electricity officers’ powers
Part 1 — Operational powers
s 136 Entry to repair etc. works or electrical installations s 137 Entry to read meters etc. s 138 Disconnection of supply if entry refused s 139 Entry to disconnect supply s 140 Entry to place to protect electricity entity’s works s 140A Entry to place to carry out remedial work s 140B Entry to place to carry out urgent remedial work Part 2 — Powers to prevent fire or electrical shock
s 141 Entry to make works or electrical installations safe Part 3 — Other provisions about exercise of electricity officer’s powers
s 141A Duty to avoid damage s 141B Associated powers on entry s 142 Electricity officer to give notice of damage s 143 Compensation Chapter 7 — Enforcement of restrictions and rationing
Part 1 — Preliminary
s 144 s 145 Definition for ch 7 Part 2 — Inspection officers
s 146 Appointment and qualifications s 147 Appointment conditions and limit on powers s 148 Issue of identity card s 149 Production or display of identity card s 150 When inspection officer ceases to hold office s 151 Resignation s 152 Return of identity card Part 2A — Powers of inspection officers
Division 1 — Entry of places
s 152A Power to enter place Division 2 — Procedure for entry
s 152B Entry with consent s 152C Application for warrant s 152D Issue of warrant s 152E Special warrant s 152F Warrant—procedure before entry Division 3 — General powers of inspection officers
s 152G General powers after entering place s 152H Power to seize evidence s 152I Powers supporting seizure s 152J Receipt for seized thing s 152K Forfeiture of seized thing s 152L Return of seized thing s 152M Access to seized thing Part 3 — Restriction regulations and rationing orders
s 153 Entry to places to investigate compliance with emergency rationing orders s 154 Disconnection for contravening regulation or order s 155 s 156 s 157 s 158 s 159 s 160 s 161 s 162 s 163 Part 4 — Other matters
s 164 Notice of damage by authorised persons s 165 Compensation Chapter 8 — Technical issues
s 166 Connection to transmission grid or supply network to comply with conditions for connection s 167 s 168 s 169 s 170 s 171 s 172 s 173 s 174 s 175 s 176 Removing anything built contrary to Act s 177 Chapter 9 — Authorities and approvals
Part 1 — Generation authorities
Division 1 — Issue of generation authority
s 178 Issue of generation authorities s 179 Application for generation authority s 179A Publication about application for generation authority s 180 Consideration of application for generation authority s 180A Code of conduct for social licence criteria s 181 Notice of refusal to issue generation authority Division 2 — Amendment of generation authority
s 182 Amendment of generation authorities s 183 Amendment of conditions stated in generation authorities s 183A Amendment of generation authorities and conditions by notice to generation entity Division 3 — Transfer of authority
s 184 Transfer of generation authorities s 184A Application for transfer s 184B Consideration of application for transfer s 184C Notice of refusal to transfer generation authority Division 4 — Surrender of generation authority
s 185 Surrender of generation authorities Part 2 — Transmission authorities
Division 1 — Issue of transmission authority
s 186 Issue of transmission authorities s 187 Transmission authorities for same area s 188 Application for transmission authority s 188A Publication about application for transmission authority s 189 Consideration of application for authority s 190 Notice of refusal to issue transmission authority Division 2 — Amendment of transmission authority
s 191 Amendment of transmission authorities s 192 Amendment of conditions stated in transmission authorities s 192A Amendment of transmission authorities and conditions by notice to transmission entity Division 3 — Transfer of authority
s 193 Transfer of transmission authorities s 193A Application for transfer s 193B Consideration of application for transfer s 193C Notice of refusal to transfer transmission authority Division 4 — Surrender of transmission authority
s 194 Surrender of transmission authorities Part 3 — Distribution authorities
Division 1 — Issue of distribution authority
s 195 Issue of distribution authorities s 195A Distribution authorities for same distribution area s 196 Application for authority s 196A Publication about application for distribution authority s 197 Consideration of application for authority s 198 Notice of refusal to issue authority Division 2 — Amendment of distribution authority
s 199 Amendment of distribution authorities s 200 Amendment of conditions stated in distribution authorities s 200A Amendment of distribution authorities and conditions by notice to distribution entity Division 3 — Transfer of authority
s 201 Transfer of distribution authorities s 201A Application for transfer s 201B Consideration of application for transfer s 201C Notice of refusal to transfer distribution authority Division 4 — Surrender of distribution authority
s 202 Surrender of distribution authorities Part 4
Division 1
s 203 s 204 s 204A s 205 s 206 Division 2
s 207 s 207A s 207AB Division 3
s 207B s 207C s 207D Part 5 — Special approvals
Division 1 — Giving of special approval
s 208 Giving of special approvals s 209 Application for special approval s 210 Consideration of application for special approval s 211 Notice of refusal to give special approval Division 2 — Amendment of special approval
s 211A Amendment of special approval s 211B Amendment of conditions stated in special approval s 211C Amendment of special approval and conditions by notice to holder of special approval Division 3 — Transfer of special approval
s 212 Transfer of special approval s 212A Application for transfer s 212B Consideration of application for transfer s 212C Notice of refusal to transfer special approval Division 4 — Surrender of special approval
s 213 Surrender of special approvals Chapter 10 — Internal and external reviews
Part 1 — Internal review of decisions
s 214 Who may apply for internal review etc. s 215 Applying for internal review s 216 Stay of operation of decision etc. s 217 Review panels, arbitration and mediation s 218 Decision on reconsideration Part 2 — External reviews
s 219 Who may apply for external review s 220 Application of QCAT Act notice requirement s 221 s 222 s 223 s 224 s 225 s 226 Chapter 11 — General
Part 1A — Provisions for civil penalty proceedings
s 226A Relationship with criminal proceedings s 226B Avoidance of multiple penalties Part 1 — Offences
s 227 Unlawful to convey electricity etc. beyond own property s 228 Unlawfully in or on premises where works situated s 229 Potential damage to electric lines by projectiles s 230 Unlawful interference with electricity entity’s works s 231 Unlawful connection to transmission grid or supply network s 232 Unlawful interference with supply of electricity to customer s 233 Offence to contravene emergency rationing order s 234 s 235 Unlawful taking of electricity s 236 Obstruction of electricity officers and inspection officers s 237 Impersonation of electricity officers and inspection officers s 238 False or misleading information s 239 False, misleading or incomplete documents s 240 Impersonation of person named in document s 240A Executive officer may be taken to have committed offence s 241 Attempts to commit offences s 242 Proof of unlawfulness s 243 Offences are summary offences s 244 Start of offence proceedings Part 2 — Evidentiary provisions
s 245 Application of part s 246 Proof of appointments s 247 Proof of signatures s 248 Evidentiary certificates by regulator s 249 Evidentiary certificate by electricity entity’s chief executive officer etc. s 250 s 251 Proof of taking of electricity etc. s 251A Evidentiary effect of code contravention notice Part 3 — Miscellaneous
s 252 Condition may require compliance with standards, codes etc. s 253AA Direction by Minister to give information or advice s 253 Advisory committees s 253A Reporting to Minister by QCA s 254 Protection from liability s 254AA Protection from liability of member or employee of QCA s 254AB Meaning of particular terms for a relevant body corporate s 254A Attachment—words defined in other legislation referred to in this Act s 254B Registers QCA must keep Chapter 12 — State electricity entities
Part 1 — General
s 255 State electricity entities do not represent the State s 256 Application of Judicial Review Act s 257 Directions to State electricity entities and related group entities s 257A s 258 s 259 s 259A Regulation may declare a State electricity entity for particular purposes Part 2 — Superannuation
s 260 State electricity entities to take part in regulated superannuation scheme s 261 s 262 Membership of certain superannuation schemes continued Chapter 13 — Regulations
s 263 General regulation-making power s 264 Regulation about matters in sch 2 s 265 s 266 Energy labelling and performance standards s 267 s 268 Chapter 14 — Transitional and validation provisions
Part 1 — Provisions for original Act (1994 No. 64)
s 269 Definition s 270 s 271 s 272 s 273 s 274 s 275 s 276 Transfer of officers to the department s 277 s 278 s 279 s 280 First declaration of approved superannuation scheme s 281 s 281A s 282 s 283 s 284 s 285 s 285A Electricity Act 1976 references s 286 References to electricity boards, electricity authorities and electricity supply industry s 287 Gladstone power station provisions s 287A Gladstone power station arrangements s 288 Supply under special agreements under s 172 of repealed Act Part 2 — Transitional provision for Electricity Amendment Act (No. 2) 1997
s 289 s 290 s 291 s 292 s 293 s 294 s 295 s 296 s 297 s 298 s 300 s 300A s 300B s 301 s 302 s 302A s 302B s 302C National Electricity Rules replace Queensland Grid Code Part 3 — Transitional provision for Electricity Amendment Act 2000
s 303 Continuation of existing regional electricity councils Part 4 — Transitional provision for Integrated Planning and Other Legislation Amendment Act 2001
s 304 Application of Acts Interpretation Act, s 20 Part 5 — Transitional provisions for Electricity And Other Legislation Amendment Act 2003
s 305 Existing on-supply agreements s 306 Particular existing agreements about common area consumption s 307 Existing exemptions from Act Part 6 — Validation provision
s 308 Validation of particular acts by relevant bodies corporate Part 7 — Transitional provision for Electricity Amendment Act 2004
s 309 Existing electricity supply contracts Part 8 — Transitional provisions for Electricity and Other Legislation Amendment Act 2006
s 310 Definitions for pt 8 s 311 Extension of area retail obligation s 312 Small customer may enter into negotiated retail contract before FRC day s 313 Existing contestable customers who are receivers s 314 Existing standard customer connection contracts s 315 Existing standard customer sale contracts s 316 References to other particular contracts under pre-amended Act s 317 Exclusion of new s 40DB for existing negotiated sale and connection contracts s 318 Particular unmetered street lighting s 319 Other unmetered connection points s 319A Particular watchman lights s 320 Obligation to decide notified prices for 2007–2008 financial year on basis of post-amended Act s 321 Making of transitional conduct rules about marketing conduct s 322 Existing mediated agreements s 323 Existing orders on arbitrated disputes s 324 Preservation of appeal rights about former contribution and user-pays fees s 325 Transitional provision for non-liable loads Part 8A — TRANSITIONAL PROVISION FOR RIGHT TO INFORMATION ACT 2009
s 325A Part 9 — Transitional provision for Mines and Energy Legislation Amendment Act 2009
s 326 Existing distribution service pricing for Mount Isa–Cloncurry supply network Part 10 — TRANSITIONAL PROVISION FOR WATER AND OTHER LEGISLATION AMENDMENT ACT 2010
s 327 Part 10A — Transitional provisions for Electricity Price Reform Amendment Act 2011
s 328 Qualifying generators connected, or about to be connected, to supply network s 329 Investigation and report by QCA in relation to price determination for relevant tariff year s 330 Part 11 — Transitional provision for repeal of Community Ambulance Cover Act 2003
s 331 Continuation of relevant former provisions for retail authority and special approval Part 12 — Transitional provision for Treasury (Cost of Living) and Other Legislation Amendment Act 2012
s 332 s 333 Inclusion of carbon and renewable energy target cost estimates in particular accounts Part 13 — Transitional provision for Electricity (Early Termination) Amendment Act 2012
s 334 Early termination of particular negotiated retail contracts Part 14 — Transitional provision for Water Legislation (Dam Safety and Water Supply Enhancement) and Other Legislation Amendment Act 2012
s 335 When s 328 stops applying or does not apply to qualifying generators as previously defined Part 15 — Transitional provisions for Energy and Water Legislation Amendment Act 2013
Division 1 — Repeal of Clean Energy Act 2008
s 336 Repeal Division 2 — Transitional provisions for repeal of Clean Energy Act 2008
s 337 Definitions for div 2 s 338 Existing applications s 339 Offence proceedings s 340 No offence proceeding to be started after commencement s 341 Existing entitlement to apply for internal review s 342 Existing proceedings for external review s 343 Existing entitlement to apply for external review Division 3 — Transitional provisions for expiry of chapter 5A
s 344 Definitions for div 3 s 345 Words have meaning given by former chapter 5A s 346 No compensation etc. s 347 Saving provision for pre-expiry matters s 348 GECs have no value after expiry s 349 Liability of particular persons for civil penalty s 350 Monitoring Part 16 — Transitional provision for Electricity and Other Legislation Amendment Act 2014
s 351 First feed-in tariff decision Part 17 — Transitional provisions for Electricity Competition and Protection Legislation Amendment Act 2014
s 352 Generation authorities s 353 Customer connection services s 354 Undecided retail authority applications s 355 Existing retail authorities s 356 Special approvals s 357 QCA industry codes s 358 Continuation of actions by QCA s 359 Limited continuation of disciplinary action by regulator Part 18 — Transitional provision for Electricity and Other Legislation (Batteries and Premium Feed-in Tariff) Amendment Act 2018
s 360 Application of s 44A Part 19 — Transitional provision for Energy (Renewable Transformation and Jobs) Act 2024
s 361 Social licence criteria do not apply for existing applications Part 20 — Validation provision for Mineral and Energy Resources and Other Legislation Amendment Act 2024
s 362 Validation of acquisitions of land Part 21 — Validation of transfers of particular generation authority
s 363 Transfer dated 14 June 2024 s 364 Transfer dated 20 June 2025 Part 1 — Decisions about authorities and special approvals Schedule 1 — Review of administrative decisions Schedule 2 — Subject matter for regulations
s 1 Conditions of supply and sale Schedule 2 — Subject matter for regulations Part 2 — Other decisions s 2 Requirements and standards s 3 Generation, transmission and supply s 3A Conditions of authorities and approvals s 3B Prescribed things and prohibited interests s 4 General Schedule 5 — Dictionary Attachment — Extracts from other legislation referred to in the Act , No provisions
Part — Gladstone Power Station Agreement Act 1993
s 2 Definitions Schedule 1 — State agreement
s 1 Definitions Part — Telecommunications Act 1997 (Cwlth)
s 7 Definitions s 15 Content service